(A)
Sponsored Projects
S.No. |
Sponsoring Organisation |
Title of Project |
Co-Investigators |
1 |
DST (2005-2009) |
Effect of Compressive load on uplift capacity of piles/pile groups in marine clay |
|
2 |
CSIR (2006-2010) |
Liquefaction potential evaluation and Design of flyash dyke |
|
3 |
CARE, IITK (2007-2008) |
Cyclic Triaxial Testing System to Evaluate Shear Strength and Liquefaction Potential of Noncohesive Soil |
|
4 |
DST (2008-2012) |
Evaluation of Liquefaction Potential of Fly ash Dyke along Indo-Gangetic plains |
|
5 |
DST (2010-2013) |
Evaluation of Liquefaction Potential of Alluvial soil along Indo-Gangetic plains |
Javed Malik IIT Kanpur |
6 |
RDSO (2013-2014) |
Economical construction of Railway Embankment in Urban area using Reinforced Earth Wall and Reinforced Steep Slope- Development of Methods |
|
7 |
BRNS (2013-2016) |
Ground Response Analysis of Soils from North India Considering Soil Strain |
|
8 |
BRNS (2018-2021) |
A study of time effects on behavior of Pile-raft foundations |
S. Rajesh IIT Kanpur |
9 |
PAAB (2017-2020) |
Field validation of stabilized material for subgrade pavement |
S. Rajesh IIT Kanpur |
10 |
CSIR (2017-2020) |
An Experimental and Numerical Assessment of Indian Crushable Sands Under Cyclic Loading |
N. R. Patra IIT Kanpur |
(B)
Consultancy Projects (Since 2010)
S.No. |
Period |
Organisation |
Nature of Work |
1 |
October 2019 -October 2020 |
UP Avas Vikas |
Possibility of Relative Settlement of Foundation Blocks Under Construction and Blocks to be Constructed later date over the same Raft Foundatoin (Amrapali Yojana, Lucknow) |
2 |
August 2019 -August 2021 |
NTPC, Rihand |
Study of Subsoil Characteristics and Possibility of Buttressing to Enhance Ash Dyke Life at NTPC Rihand |
3 |
April 2019 -April 2020 |
PNC Infratech Limited |
Development of Purvanchal Expressway (Package VI) from Gobindpur (Azamgarh) to Mojrapur (Azamgarh) in UP |
4 |
April 2019 -April 2020 |
PNC Infratech Limited |
Development of Purvanchal Expressway (Package V) from Sansarpur (Sultanpur) to Gobindpur (Azamgarh), UP |
5 |
April 2019 -April 2020 |
GR Infra Projects Limited |
Develoment of Purvanchal Expressway (Package VII) from Mojrapur (Dist. Azamgarh) to Bijaura (Dist. Ghazipur), UP |
6 |
April 2019 -March 2020 |
Oriental Structural Engineering Private Limited |
Development of Purvanchal Expressway (Package VIII), UP |
7 |
July 2019 - July 2020 |
Gayatri Projects Limited |
Development of Purvanchal Expressway (Package I & II) from Chand Sarai (Dist Lucknow) to Sansar and from Sansara to Jaraikaa, UP |
8 |
May 2019 -May2020 |
Isgec Heavy ENGINEERING Limited |
Soil Testing of Earthen Bund and Testing of Blended Clay with Bentonite |
9 |
March 2019 -March 2020 |
Gayatri Projects Limited |
Development of Purvanchal Expressway (Package II) from Sansara (Dist. Barabanki) to Jaraikala (Dist. Amethi), UP |
10 |
March 2019 -March 2020 |
Kanwar Enterprises Private Limited |
Consultancy for Testing of Pond Ash Sample, Ganga River Sand Sample and Soil Sample Followed by Analysis of Filter Criteria as per IS 9429 |
11 |
April 2019 -April 2020 |
PNC Infratech Limited |
Development of Purvanchal Expressway (Package V) from Sansarpur (Sultanpur) to Gobindpur (Azamgarh), UP |
12 |
March 2019 -March 2020 |
Kanwar Enterprises Private Limited |
Consultancy for Testing of Pond Ash Sample, Ganga River Sand Sample and Soil Sample Followed by Analysis of Filter Criteria as per IS 9429 |
13 |
February 2019 -February 2020 |
LIC, India |
Consultancy on "Study of Subsoil Characteristics for Residential Units (Stilt Plus Three Storeys) Officers Quarters at Mansarovar, Lucknow" |
14 |
February 2018 - April 2019 |
NTPC |
Consultancy and Setting of Bottom Ash & Pond Ash Samples as per Filter Criteria (as suggested By CC(Engg.), NTPC, Rihand) & Recommendation to use as Filter Media in Ash Dyke Raising Works |
15 |
January 18 - December 2018 |
ISGEC Heavy Engineering Limited |
Consultancy on "Ash Dyke" Design and Stability Analysis for Project: 2x20 MW CPP at NTPC-Sail Power Company Limited (NSPCL), Durgapur West Bengal |
16 |
February 2018 -February 2019 |
RDSO |
Consultancy For Construction of Important Bridge on Yamuna River at Agra between Agra Fort and Yamuna Bridge Station |
17 |
March 2017 -March 2018 |
NTPC |
Consultancy and testing for use of bottom ash as filter material against pond ash as substitute of sand in ash dyke raising works at NTPC Limited, Rihand, Sonebhadra, UP |
18 |
December 2016 - December 2017 |
M/S Ghanaram Infra Engineers Private Limited |
Consultancy regarding study of subsoil characteristics from borrow area of Gora & Jujharpura, Jhansi |
19 |
December 2015 -December 2016 |
Tata-Aldesa (JV), DFCCIL Lot 101 Kanpur (Tataal) |
Consultancy for study of sub grade and blanket material characteristic for design of formation for heavy axle load at Bhaupar-Etawah Railway Track |
20 |
December 2015 -December 2016 |
Ventech Engineers |
Study of subsoil characteristics at OBRA Thermal Power Station |
21 |
May 2015 -May 2016 |
Ventech Engineers |
Plate Load test and Block Vibration Test |
22 |
January 2015 - January 2016 |
NTPC |
Testing of bottom ash and fly ash for filter criteria at the site of NTPC, Unchahar Raebareli |
23 |
August 2014 -August 2015 |
UPSIDC |
Consultancy regarding developing of trans-Ganga project an integrated industrial township on Ganga Barrage-Unnao Road |
24 |
July 2013 - March 2015 |
PWD Lucknow |
Geotechnical characterization of pavement materials for road construction using recycled aggregates |
25 |
May 2013 - February 2014 |
Isolux Corsan (ISOLUX) |
Study of subsoil characteristics at the location of UPPTCL 800kv UHV substation at Mainpuri |
26 |
January 2012 - January 2013 |
ABB Limited Jaipur |
Consultancy for foundation of electric pole foundation |
27 |
June 2011 - June 2012 |
PWD Lucknow |
Consultancy regarding Banda Bypass Road |
28 |
April 2011 - April 2012 |
Marg Limited, New Delhi |
Subsoil investigations at Smriti Apartments site, Kursi Road, Lucknow |
29 |
July 2010 -July 2011 |
BSCC |
Lining work of mejajirgo link canal |
30 |
September 2010 - September 2011 |
Paricha Thermal Power Plant |
Design check of Foundation of ESP at Parichha Thermal Power Plant |
31 |
May 2010 - July 2010 |
Irrigation Construction Division, UP |
Plate Load Test |
32 |
November 2009 - December 2009 |
ICI Private Limited |
Plate Load Test |
33 |
April 2009 - June 2009 |
ICI Private Limited |
Soil Investigation for plant |
34 |
April 2008 - June 2008 |
Power Plant Gujarat |
Swelling Potential of Compacted Fill at Combined Cycle Power Plant in Gujarat |