Projects

 

(A)       Sponsored Projects

S.No.

Sponsoring Organisation

Title of Project

Co-Investigators
(if any)

1

DST

(2005-2009)

Effect of Compressive load on uplift capacity of piles/pile groups in marine clay

 

 

2

CSIR

(2006-2010)

Liquefaction potential evaluation and Design of flyash dyke

 

3

CARE, IITK

(2007-2008)

Cyclic Triaxial Testing System to Evaluate Shear Strength and Liquefaction Potential of Noncohesive Soil

 

4

DST

(2008-2012)

Evaluation of Liquefaction Potential of Fly ash Dyke along Indo-Gangetic plains

 

5

DST

(2010-2013)

Evaluation of Liquefaction Potential of Alluvial soil along Indo-Gangetic plains

Javed Malik

IIT Kanpur

6

RDSO

(2013-2014)

Economical construction of Railway Embankment in Urban area using Reinforced Earth Wall and Reinforced Steep Slope- Development of Methods

 

7

BRNS

(2013-2016)

Ground Response Analysis of Soils from North India Considering Soil Strain

 

8

BRNS

(2018-2021)

A study of time effects on behavior of Pile-raft foundations

S. Rajesh

IIT Kanpur

9

PAAB

(2017-2020)

Field validation of stabilized material for subgrade pavement

S. Rajesh

IIT Kanpur

10

CSIR

(2017-2020)

An Experimental and Numerical Assessment of Indian Crushable Sands Under Cyclic Loading

N. R. Patra

IIT Kanpur

 

(B)        Consultancy Projects (Since 2010)

S.No.

Period

Organisation

Nature of Work

1

October 2019

-October 2020

UP Avas Vikas

Possibility of Relative Settlement of Foundation Blocks Under Construction and Blocks to be Constructed later date over the same Raft Foundatoin (Amrapali Yojana, Lucknow)

2

August 2019

-August 2021

NTPC, Rihand

Study of Subsoil Characteristics and Possibility of Buttressing to Enhance Ash Dyke Life at NTPC Rihand

3

April 2019

-April 2020

PNC Infratech Limited

Development of Purvanchal Expressway (Package VI) from Gobindpur (Azamgarh) to Mojrapur (Azamgarh) in UP

4

April 2019

-April 2020

PNC Infratech Limited

Development of Purvanchal Expressway (Package V) from Sansarpur (Sultanpur) to Gobindpur (Azamgarh), UP

5

April 2019

-April 2020

GR Infra Projects Limited

Develoment of Purvanchal Expressway (Package VII) from Mojrapur (Dist. Azamgarh) to Bijaura (Dist. Ghazipur), UP

6

April 2019

-March 2020

Oriental Structural Engineering Private Limited

Development of Purvanchal Expressway (Package VIII), UP

7

July 2019

- July 2020

Gayatri Projects Limited

Development of Purvanchal Expressway (Package  I & II) from Chand Sarai (Dist Lucknow) to Sansar and from Sansara to Jaraikaa, UP

8

May 2019

-May2020

Isgec Heavy ENGINEERING Limited

Soil Testing of Earthen Bund and Testing of Blended Clay with Bentonite

9

March 2019

-March 2020

Gayatri Projects Limited

Development of Purvanchal Expressway (Package II) from Sansara (Dist. Barabanki) to Jaraikala (Dist. Amethi), UP

10

March 2019

-March 2020

Kanwar Enterprises Private Limited

Consultancy for Testing of Pond Ash Sample, Ganga River Sand Sample and Soil Sample Followed by Analysis of Filter Criteria as per IS 9429

11

April 2019

-April 2020

PNC Infratech Limited

Development of Purvanchal Expressway (Package V) from Sansarpur (Sultanpur) to Gobindpur (Azamgarh), UP

12

March 2019

-March 2020

Kanwar Enterprises Private Limited

Consultancy for Testing of Pond Ash Sample, Ganga River Sand Sample and Soil Sample Followed by Analysis of Filter Criteria as per IS 9429

13

February 2019

-February 2020

LIC, India

Consultancy on "Study of Subsoil Characteristics for Residential Units (Stilt Plus Three Storeys) Officers Quarters at Mansarovar, Lucknow"

14

February 2018

- April 2019

NTPC

Consultancy and Setting of Bottom Ash & Pond Ash Samples as per Filter Criteria (as suggested By CC(Engg.), NTPC, Rihand) & Recommendation to use as Filter Media in Ash Dyke Raising Works

15

January 18

- December 2018

ISGEC Heavy Engineering Limited

Consultancy on "Ash Dyke" Design and Stability Analysis for Project: 2x20 MW CPP at NTPC-Sail Power Company Limited (NSPCL), Durgapur West Bengal

16

February 2018

-February 2019

RDSO

Consultancy For Construction of Important Bridge on Yamuna River at Agra between Agra Fort and Yamuna Bridge Station

17

March 2017

-March 2018

NTPC

Consultancy and testing for use of bottom ash as filter material against pond ash as substitute of sand in ash dyke raising works at NTPC Limited, Rihand, Sonebhadra, UP

18

December 2016

- December 2017

M/S Ghanaram Infra Engineers Private Limited

Consultancy regarding study of subsoil characteristics from borrow area of Gora & Jujharpura, Jhansi

19

December 2015

-December 2016

Tata-Aldesa (JV), DFCCIL

Lot 101 Kanpur (Tataal)

Consultancy for study of sub grade and blanket material characteristic for design of formation for heavy axle load at Bhaupar-Etawah Railway Track

20

December 2015

-December 2016

Ventech Engineers

Study of subsoil characteristics at OBRA Thermal Power Station

21

May 2015

-May 2016

Ventech Engineers

Plate Load test and Block Vibration Test

22

January 2015

- January 2016

NTPC

Testing of bottom ash and fly ash for filter criteria at the site of NTPC, Unchahar Raebareli

23

August 2014

-August 2015

UPSIDC

Consultancy regarding developing of trans-Ganga project an integrated industrial township on Ganga Barrage-Unnao Road

24

July 2013

- March 2015

PWD

Lucknow

Geotechnical characterization of pavement materials for road construction using recycled aggregates

25

May 2013

- February 2014

Isolux Corsan (ISOLUX)

Study of subsoil characteristics at the location of UPPTCL 800kv UHV substation at Mainpuri

26

January 2012

- January 2013

ABB Limited

Jaipur

Consultancy for foundation of electric pole foundation

27

June 2011

- June 2012

PWD

Lucknow

Consultancy regarding Banda Bypass Road

28

April 2011

- April 2012

Marg Limited, New Delhi

Subsoil investigations at Smriti Apartments site, Kursi Road, Lucknow

29

July 2010

-July 2011

BSCC

Lining work of mejajirgo link canal

30

September 2010

- September 2011

Paricha Thermal Power Plant

Design check of Foundation of ESP at Parichha Thermal Power Plant

31

May 2010

- July 2010

Irrigation Construction Division, UP

Plate Load Test

32

November 2009

- December 2009

ICI Private Limited

Plate Load Test

33

April 2009

- June 2009

ICI Private Limited

Soil Investigation for plant

34

April 2008

- June 2008

Power Plant Gujarat

Swelling Potential of Compacted Fill at Combined Cycle Power Plant in Gujarat